Completed in February 2023, RYCON’s latest commercial project located at Crestmead, south of Brisbane, combines a functional warehouse and modern office space.
Designed for an investor client adding to their commercial property portfolio, this Design and Construct project was briefed around securing a long-term tenant who would appreciate and look after the new building. Prior to commencing earthworks, this 2600m2 cleared site was part of a new industrial estate. In collaboration with Kelly Gray from Sparc Architects, this project was design completed and approved, and constructed, all within 18 months.
Warehouse
RYCON’s commercial division constructed a 2400m2 warehouse using a precast concrete panel and steel girder system, allowing for a full clear span, with one single post which supports the main ridge beam from which all the rafters run off. The client was looking for a space that is purpose built for manufacturing and storing specialised steel pallets designed to transport specialised mining equipment for their tenant. At its lowest point, the warehouse is 8.5m high, and at the highest point, 10m high. This tall and full clear span allows tenants to maximise space for operations personnel alongside material handling equipment, and for adaptability as the company using the warehouse, grows.
Office
Incorporated into this warehouse build is an expansive state of the art office, with an auto on and off LED lighting system; turning the lights off after 20 minutes when no movement has been detected, then turning on automatically once movement is detected. Additional to the LED lighting system, making the office brighter is the incorporation of a window wall that casts natural light through the space. Creating a light and open office allows for a more positive workplace for employees to enjoy the space they work in. Open plan office space also allows for the tenant to have complete design control over the number of work-stations required, based on staff numbers.
Outside & Surrounding
The 6m x 6m warehouse doors and the large pavement area outside of the building was designed and built to allow semi-trailers to safely turn around and efficiently load and unload the specialised pallets.
The exterior of this site is fully landscaped and fenced by RYCON, providing more security for the tenant. Both the warehouse and office are fully equipped with a full wet fire safety sprinkler system with an on-site dedicated water tank.
You can view all aspects of the finished warehouse below!
With 20 years of experience, RYCON can help you get started, no matter where you are in the planning process. Contact us on (07) 3899 6355 for a complimentary consultation.
More from the blog
Create a space that changes with the seasons
As the cooler nights begin to roll in and the air turns crisp, it is only natural we adapt our homes to suit the upcoming seasonal shift to Winter. We’ve put together some stylish ways you can warm...
5 ways to make your home sustainable
Are you striving to incorporate more eco friendly additions to your home? Whether you are a new homeowner looking for ideas or are interested in maximising your current efficiencies, there are...
Behind the Build: AEG Head Office
Project: Head Office Precinct Location: 75 Metroplex Place, Wacol, QLD Completion Date: November 2020 Client: Advanced Engineering Group (AEG) RYCON Constructions were contracted to design and...